Krimpenerwaard 2023
Category | Rate water system levy | Rate road levy |
---|---|---|
Uncultivated and arable land per hectare | € 108.48 | € 40.53 |
Built-up property % of the WOZ value | 0.0194% | 0.0207% |
Residents per housing unit | € 121.80 | € 50.73 |
Nature site per hectare | € 3.94 | € 40.53 |
Uncultivated and arable land outside the dykes per ha | € 27.12 | € 40.53 |
Built-up % of the WOZ value outside the dykes | 0.0049% | 0.0207% |
Water system levy roads per ha | € 216.96 | € 40.53 |
Water system levy roads outside the dykes per ha | € 135.60 | € 40.53 |
Wastewater treatment levy | Rate |
---|---|
1 unit of pollution (1ve) | € 66.62 |
3 units of pollution (3ve) | € 199.86 |