Krimpenerwaard 2021
Category | Rate water system levy | Rate road levy |
---|---|---|
Uncultivated and arable land per hectare | € 92.92 | € 35.08 |
Built-up property % of the WOZ value | 0.0216% | 0.0226% |
Residents per housing unit | € 107.88 | € 44.27 |
Nature site per hectare | € 3.29 | € 35.08 |
Rate differentiation | Rate water system levy | Rate road levy |
---|---|---|
Uncultivated and arable land outside the dykes per ha | € 23.23 | € 35.08 |
Built-up % of the WOZ value outside the dykes | 0.0054% | 0.0226% |
Water system levy roads per ha | € 185.84 | € 35.08 |
Water system levy roads outside the dykes per ha | € 116.15 | € 35.08 |
Wastewater treatment levy | Rate |
---|---|
1 unit of pollution (1ve) | € 51.26 |
3 units of pollution (3ve) | € 153.78 |